Oil and gas lifting safety requires careful planning, competent personnel, suitable lifting equipment, effective rigging, controlled load movement and strict protection of people from suspended loads and other lifting hazards.

Fundamentals

What Is Oil and Gas Lifting Safety?

Oil and gas lifting safety is the systematic control of hazards created when cranes, hoists, winches and other lifting equipment are used to move loads during drilling, production, maintenance, construction and logistics activities.

Lifting operations can expose workers to suspended loads, swinging equipment, falling objects, equipment instability, rigging failure and crushing hazards.

Safe lifting therefore requires more than a capable crane. The complete lifting system includes the load, lifting appliance, accessories, supporting surface, personnel, environment and method used to perform the lift.

Major Hazards

Understand Oil and Gas Lifting Hazards

Hazards should be identified before the lift begins and reassessed when conditions change.

Falling Loads

Rigging failure, incorrect attachment, unstable loads or equipment failure can allow all or part of a load to fall.

Moving Loads

Swinging or rotating loads can strike personnel, structures, process equipment or other objects within the load path.

Crane Instability

Poor ground conditions, excessive loading, incorrect configuration or environmental conditions can affect crane stability.

Planning

Plan Every Lifting Operation

Lifting operations should be planned in proportion to their complexity and risk.

The plan should identify the load, lifting method, equipment, personnel, load path, environmental limitations, communication arrangements and controls needed to complete the lift safely.

Routine lifting may use an established plan where conditions remain within defined limits. Complex or unusual lifts can require more detailed engineering and planning.

Risk Assessment

Assess Oil and Gas Lifting Risks Before the Lift

The lifting risk assessment should consider both the lifting equipment and the environment in which the operation will occur.

Important factors can include load weight, center of gravity, rigging arrangement, crane capacity, ground conditions, nearby equipment, overhead hazards, weather, visibility and simultaneous operations.

The assessment should be reviewed when the lift cannot be completed according to the original plan.

Load Information

Know the Load Before Lifting

The lifting team should have reliable information about the load before selecting equipment and rigging.

Important considerations include weight, dimensions, center of gravity, lifting points, structural integrity and whether loose components or internal contents could shift during movement.

Load weight should not be guessed when an inaccurate estimate could result in lifting equipment being overloaded.

Equipment Selection

Select Suitable Lifting Equipment

The crane or other lifting appliance should be suitable for the load, required reach, operating radius and environmental conditions.

Rated capacity depends on equipment configuration and operating conditions, so the maximum capacity stated for a crane should not automatically be treated as available for every lift.

Load charts, manufacturer information and applicable operational limits should be understood by personnel responsible for planning and operating the equipment.

Rigging

Select the Correct Slings and Lifting Accessories

Slings, shackles, hooks, spreader beams and other accessories should be suitable for the load and lifting configuration.

The rigging arrangement should consider accessory capacity, sling angles, connection points, load distribution and potential damage from sharp edges or unsuitable contact surfaces.

Lifting accessories should be identifiable and inspected according to the organization’s equipment-control system and applicable requirements.

Inspection

Inspect Lifting Equipment Before Use

Pre-use inspection can identify visible damage, deterioration, missing components and other conditions that may affect safe lifting.

Cranes, hoists, slings, shackles, hooks and other lifting equipment should be inspected at the frequency and level appropriate to the equipment and applicable requirements.

Equipment that does not meet acceptance criteria should be removed from service or otherwise controlled so it cannot be unintentionally used.

Ground Conditions

Confirm Crane Stability and Ground Support

Mobile crane stability depends partly on the surface supporting the crane and its outriggers or stabilizers.

Ground conditions should be assessed for bearing capacity, slope, underground hazards, excavations and other conditions that could affect stability.

Suitable mats or other load-distribution arrangements should be used where required by the lift plan, equipment instructions or ground assessment.

Load Path

Plan a Safe Load Path

The planned path should minimize exposure of personnel and avoid unnecessary movement over occupied areas, live process equipment or other sensitive locations.

Obstructions, structures, piping, electrical hazards and nearby operations should be identified before movement begins.

Where the planned path becomes unavailable or unsafe, the lift should be stopped and reassessed rather than improvised while the load is suspended.

Exclusion Zones

Keep Personnel Clear of Suspended Loads

Personnel should be kept clear of overhead loads and areas where they could be struck, crushed or trapped by load movement.

Exclusion zones should reflect the load path, possible swing, equipment movement and credible consequences if the load or rigging fails.

Workers should never use their body position as the primary means of controlling a suspended load.

Communication

Establish Clear Lifting Communication

Crane operators may not have direct visibility of every part of the lift, making reliable communication essential.

The lifting team should agree on the communication method before work begins, including standard signals or radio communication where appropriate.

Personnel should understand who is authorized to direct normal crane movement and how an emergency stop is communicated.

Competence

Use Competent Lifting Personnel

Safe lifting depends on personnel having competence appropriate to their responsibilities.

Crane operators, riggers, signalers, lifting supervisors and personnel planning complex lifts require suitable knowledge and practical ability for the tasks assigned to them.

Roles should be clearly allocated so responsibility for planning, directing, rigging and operating the lift is understood before work begins.

Pre-Lift Briefing

Brief the Lifting Team Before Starting

The lift team should review the planned operation before the load is moved.

The briefing should cover responsibilities, load information, equipment, rigging, load path, exclusion zones, communication and relevant stop-work conditions.

Questions or conflicts should be resolved before the lift begins rather than during load movement.

Trial Movement

Confirm Load Stability Before Continuing the Lift

Where appropriate, the load can initially be raised only enough to verify that the rigging is taking the load as intended and that the load remains stable.

The lifting team should watch for unexpected tilt, rigging movement, load shift or other indications that the lifting arrangement requires correction.

If the load behaves differently from the plan, it should be returned to a safe position and the arrangement reassessed.

Load Control

Control Suspended Loads Without Creating New Hazards

Tag lines or other suitable methods may be used when the lift plan determines that additional load control is necessary.

The selected method should allow personnel to maintain appropriate separation from the load while avoiding entanglement, line-of-fire and pinch-point hazards.

Personnel should not attempt to stop a swinging heavy load by placing themselves in its path.

Weather

Monitor Wind and Environmental Conditions

Wind can significantly affect suspended loads, crane booms and the stability of lifting operations, particularly when loads have large surface areas.

Visibility, rain, lightning, sea state and other environmental conditions may also affect lifting safety depending on the operation.

Operations should remain within the limitations established by the lift plan, equipment manufacturer and applicable site requirements.

Power Lines

Control Lifting Near Electrical Hazards

Cranes and suspended loads can create severe electrical hazards when operating near overhead power lines or energized equipment.

The lift plan should identify electrical proximity hazards and establish appropriate clearances, isolation or other controls according to applicable requirements.

Operators and signalers should understand the restricted areas before crane movement begins.

Simultaneous Operations

Coordinate Lifting With Nearby Oil and Gas Operations

Lifting can interact with drilling, production, maintenance, vehicle movement and other activities occurring nearby.

Simultaneous operations should be reviewed for conflicts such as lifting over active work areas, obstructing emergency routes or exposing process equipment to impact.

Incompatible activities should be separated, suspended or otherwise controlled before the lift proceeds.

Process Areas

Protect Live Process Equipment During Lifting

A dropped or swinging load can damage piping, vessels, valves and other hydrocarbon-containing equipment.

Lifts near live process systems should therefore consider both personnel injury and the potential for secondary loss of containment, fire or process escalation.

Where practicable, the load path should avoid vulnerable process equipment and other safety-critical systems.

Permit to Work

Coordinate Lifting With the Permit to Work System

Certain lifting activities may require formal work authorization depending on the site, lift and surrounding hazards.

Where permit controls apply, the lifting plan and work authorization should be coordinated so equipment status, nearby activities and relevant precautions remain consistent.

The permit should not replace the technical planning and supervision required for the lifting operation itself.

Dropped Objects

Inspect Loads for Loose and Unsecured Items

The primary load may remain secure while smaller objects fall from it during movement.

Loads should be checked for loose tools, components, covers, debris and other items that could become dropped objects during lifting.

Containers, baskets and equipment assemblies should be suitable for lifting and their contents secured before movement begins.

Complex Lifts

Apply Additional Control to Complex Lifting Operations

Some lifts involve additional complexity because of unusual loads, restricted locations, multiple lifting appliances, limited clearances or other challenging conditions.

These operations can require more detailed engineering, calculations, planning, supervision and approval than routine lifting.

The organization should establish criteria for identifying lifts that require enhanced planning and control.

Stop Work

Stop the Lift When Conditions Change

A lift should not continue simply because the load has already left the ground.

Unexpected weather, loss of communication, equipment alarms, unstable loads, personnel entering exclusion zones or changes to the load path can invalidate the original plan.

The operation should be placed in a safe condition and reassessed before continuing when significant deviations occur.

Drilling

Manage Lifting Hazards Around Drilling Rigs

Drilling operations involve frequent movement of tubulars, equipment and supplies using cranes, hoists and rig-specific lifting systems.

Rig lifting should be coordinated with personnel movement, well operations, tubular handling and other simultaneous activities.

Particular attention should be given to line-of-fire hazards and personnel working beneath elevated rig structures.

Practical Framework

A Practical Oil and Gas Lifting Safety Process

Effective oil and gas lifting safety connects planning, equipment verification, controlled execution and active monitoring.

01

Plan

Define the load, lifting method, equipment, personnel, environment and safe load path.

02

Verify

Confirm equipment condition, rigging, ground stability, competence, communication and required controls.

03

Execute

Move the load according to the lift plan while maintaining exclusion zones and clear communication.

04

Monitor

Watch the load, equipment, environment and surrounding operations and stop when conditions deviate from the plan.

Common Weaknesses

Common Oil and Gas Lifting Safety Mistakes

People Under Loads

Allowing personnel beneath or unnecessarily close to suspended loads exposes them to potentially catastrophic consequences if the lifting system fails.

Unknown Load Information

Incorrect weight, center-of-gravity or lifting-point information can undermine equipment selection and rigging arrangements.

Deviating From the Plan

Improvised changes to equipment, load path or lifting method can introduce hazards that were not considered during planning.

Key Takeaway

Oil and Gas Lifting Safety Depends on Planning and Control

Effective oil and gas lifting safety requires the entire operation to be planned and controlled as one system. The load, crane, rigging, ground conditions, personnel, environment and surrounding operations all influence whether a lift can be completed safely.

Competent personnel, suitable equipment, clear communication, controlled exclusion zones and the discipline to stop when conditions change are fundamental to safer lifting operations.

IOSHQ Knowledge Center

Continue Your Oil & Gas Safety Learning

Explore IOSHQ resources covering lifting operations, drilling hazards, process safety, hazardous energy and practical oil and gas risk management.

Comments are disabled